Gorgon Marine Loading Arm Installation Project
AEC was engaged by KJVG via Camco and CalDive to perform the full range of feasibility studies, vessel selection, detailed lift planning and detailed design of all rigging and installation aids for the installation of ten (10) Marine Loading Arms (MLA) for the Gorgon Gas Project.