KGP Berth 3 – Propane Marine Loading Arm Refurb Project
Woodside engaged AEC to perform detailed lift planning and design of rigging and installation aids for the removal and replacement of the refurbished Propane Marine Loading Arm (MLA), Z-3501.
Woodside engaged AEC to perform detailed lift planning and design of rigging and installation aids for the removal and replacement of the refurbished Propane Marine Loading Arm (MLA), Z-3501.