North Rankin “A” – Drill Derrick Deconstruction Project
Woodside engaged AEC to perform engineering studies, detailed design, lift-planning and 5-months of site- supervision for the dismantling and removal of the redundant 60m high, 200-tonne steel drilling derrick on North Rankin “A” offshore production platform.