
Roy Hill Stockpile Tunnel Strengthening
AEC was engaged by CIVMEC to design a system for installation of steel strengthening arches for the mining company’s stockpile tunnel conveyer. Others had determined that the existing concrete tunnel was under-strength and proposed steel arches to strengthen the tunnel.