News

Okha FPSO RTM Mooring Wire Rope Changeout

The reconnection wire rope assembly for the Riser Turret Mooring (RTM) of Woodside Energy Limited's (WEL) Okha Floating Production, Storage & ...

Read more

KGP DOMGAS Flare Tip Replacement

AEC was engaged by Woodside to formulate a new lifting procedure to facilitate the changeout of the flare tips on ...

Read more

2016 CICA Lift of the Year Awards

AEC returned to the annual Crane Industry Council of Australia's (CICA) conference to present our entry in the 2016 Lift of ...

Read more

Engineers Australia Includes Nick Birks in Most Innovative Engineers List

AEC's Lead Structural Engineer Nick Birks was recently included on Engineers Australia' s Most Innovative Engineers 2016 List. Nick was nominated ...

Read more

Ichthys LNG Project Heavy Platform Lifts

AEC was recently engaged by Laing O' Rourke to assist in the Ichthys LNG Project located at Bladin Point in ...

Read more

AEC Visit Ellenbrook Christian College’s STEM Challenge Day

AEC's Lead Structural Engineer Steve Keating was invited to Ellenbrook Christian College's STEM (Science, Technology, Engineering & Mathematics) Challenge Day to ...

Read more

2015 CICA Lift Of The Year Awards

The Crane Industry Council of Australia (CICA), recognises excellence and innovation in the Australian crane industry with the CICA Lift ...

Read more

Gorgon Marine Loading Arm Installation Project

AEC was engaged by KJVG via Camco to perform the full range of feasibility studies, vessel selection, detailed lift planning ...

Read more